
Asbestos removed from a house before it is torn down
Example project
- Home
- 1960s single-story house in Fremont, with a two-car garage and a brick planter, on a street at the foot of a wooded hill
- Original request
- Tear the house down for a new two-story home
- Testing
- Samples of the ceilings, wall finishes, floors, ducts and stucco
- Found
- Asbestos in the ceiling texture, the kitchen and bath floor tile with its mastic, and the wrap on the furnace duct; the stucco is clear
- Work
- Positive materials removed room by room inside plastic, then a clearance air test
- Demolition
- One wing is already down, with the debris piled in the front yard and a small excavator parked in the driveway
- Timeline
- Samples and J#, then about two weeks of removal before the excavator arrives
- Estimated cost
- $20,500
In this example, the owners of a 1960s house in Fremont are tearing it down to build a two-story home. Even with no asbestos, a house demolition needs a J#, and the house is sampled first. The lab finds asbestos in the ceiling texture, the kitchen and bath floor tile with its mastic, and the wrap on the furnace duct. The stucco is clear.
